Kennedy and Claremore Avenue Watermain

2017-2018 construction of a watermain from Scarborough Pumping Station (the Lake) north to Midland and St Clair Avenue.


Background

In 2008, the City of Toronto completed a Municipal Class Environmental Assessment (Class EA) study to determine a preferred route for the construction of a NEW 1050 mm diameter watermain to support the existing watermain, reinforce and increase the security of water supply to the community and improve the hydraulic performance.  The existing 900 mm diameter watermain runs from Scarborough Pumping Station, along Kennedy Road area, Aylesworth & Midland Avenue to St Clair Avenue East on the route shown in the map below.

To view the 2008 Study Report

Study/Construction area map

The City of Toronto completed a Municipal Class Environmental Assessment (Class EA) in 2008 to determine a preferred route for the construction of a new 1050 mm diameter watermain to support the existing watermain along this route, reinforce the supply of water, increase the security of the water supply, and improve the overall system hydraulic performance. The existing 900 mm diameter watermain runs from Scarborough Pumping Station, along Kennedy Road, Aylesworth Avenue, and Midland Avenue to St. Clair Avenue East on the route shown in the area map.

Notices

New info