Transportation

Expressway & Major Route Closures

Last Updated:Tuesday 2014-Sep-02 07:18:01

Don Valley Parkway
 DatesTimesDescription
Full Closure Location Friday
2014-Oct-24
to
Monday
2014-Oct-27
22:00
to
05:00
Continuous
From: Gardiner Expy
To: Hwy 401
Details: The northbound and southbound lanes will be closed due to Fall Maintenance. This will be conducted by the City of Toronto.
Rain Date:
11/7/2014 22:00 to 11/10/2014 5:00
ID:11471
F. G. Gardiner Expressway
 DatesTimesDescription
  Tuesday
2014-Sep-02
to
Thursday
2014-Sep-04
23:00
to
05:00
Continuous
At: South Kingsway
Details: Off-ramp to South Kingsway will be occupied due to replacement of high voltage power cables for Hydro One. This will be done by Robert B Somerville.
ID:16056
Full Closure Location Friday
2014-Sep-26
to
Monday
2014-Sep-29
22:00
to
05:00
Continuous
From: Humber River
To: Don Valley Parkway
Details: The eastbound and westbound lanes will be closed due to Fall Maintenance. This will be conducted by the City of Toronto.
Rain Date:
10/31/2014 22:00 to 11/03/2014 5:00
ID:11474
Lake Shore Boulevard
 DatesTimesDescription
  Tuesday
2014-Apr-22
to
Sunday
2015-Feb-22
09:00
to
23:59
Continuous
From: Rees St
To: Van De Water Cres
Details: The westbound passing lane will be occupied due to installation of a tunnel. This will be conducted by C & M Mcnally Engineering.
ID:12772
  Saturday
2014-May-24
to
Wednesday
2014-Oct-15
00:01
to
00:01
Continuous
At: Leslie St
Details: Both eastbound and westbound lanes will be occupied on Lake Shore due to TTC Leslie St connection track project. The lanes will be reduced to 2 lanes in each direction through the intersection. (200m before Leslie & 200m beyond Leslie).
ID:16335
  Wednesday
2014-Jul-30
to
Tuesday
2014-Sep-30
09:00
to
16:00
Daily
At: Don Roadway
Details: All lanes in all directions will be occupied one at a time due to Toronto Hydro underground installation. This will be done by Powerline Plus.
ID:15645
  Monday
2014-Aug-18
to
Wednesday
2014-Dec-31
07:00
to
17:30
Daily
From: Brookers Lane
To: Park Lawn Rd
Details: Westbound curb lane will be occupied due to road widening/resurfacing, sidewalk construction and sanitary sewer replacement on Park Lawn Road, and on Lake Shore Blvd West. This will be done by Il Duca Contracting Inc.
ID:16019
  Tuesday
2014-Aug-19
to
Friday
2014-Sep-19
09:30
to
15:30
Weekdays
From: Lower Jarvis St
To: York St
Details: Westbound passing lane will be occupied due to F. G. Gardiner Expressway Interim Repairs by MMM Group.
ID:15957
Full Closure Location Sunday
2014-Oct-19
06:00
to
15:00
From: Windermere Ave
To: Parliament St
Details: The eastbound and westbound lanes will be closed due to Toronto Scotiabank Waterfront Marathon.
ID:11477

Notes

Full Closure LocationThese rows indicate a full road closure.

A closure can be for one day or may span multiple days.
The following table shows the definition of the notes in the time column for closures longer than one day:

Example:From 2014-02-18 09:00 To 2014-03-28 16:00
Continuous The road is closed starting 2014-02-18 at 09:00 and is not open until 2014-03-28 at 16:00.
Daily Between the dates of 2014-02-18 to 2014-03-28, the road is closed between the hours of 09:00 and 16:00 everyday and is open all other times.
Weekends Between the dates of 2014-02-18 to 2014-03-28, the road is closed between the hours of 09:00 and 16:00 on Saturdays and Sundays and is open all other times.
Weekdays Between the dates of 2014-02-18 to 2014-03-28, the road is closed between Mondays and Fridays between the hours of 09:00 and 16:00 and is open all other times.