Transportation

Expressway & Major Route Closures

Last Updated:Friday 2014-Aug-22 06:50:55

Don Valley Parkway
 DatesTimesDescription
Full Closure Location Friday
2014-Oct-24
to
Monday
2014-Oct-27
22:00
to
05:00
Continuous
From: Gardiner Expy
To: Hwy 401
Details: The northbound and southbound lanes will be closed due to Fall Maintenance. This will be conducted by the City of Toronto.
Rain Date:
11/7/2014 22:00 to 11/10/2014 5:00
ID:11471
F. G. Gardiner Expressway
 DatesTimesDescription
  Wednesday
2014-Jul-30
to
Friday
2014-Aug-29
07:00
to
19:00
Daily
From: Park Lawn Rd
To: Humber River
Details: Eastbound and westbound lanes are occupied due to construction. This is being conducted by Soncin Construction.
ID:14814
  Friday
2014-Aug-22
to
Saturday
2014-Aug-23
10:00
to
14:00
Continuous
From: Park Lawn Rd
To: Humber River
Details: The westbound left shoulder and left lane will be occupied due to construction at the centre median. This will be conducted by Morrison Hershfield.
ID:16141
  Friday
2014-Aug-22
10:00
to
14:00
At: Kipling Ave
Details: Left lane will be occupied for emergency maintenance work under the Kipling Ave bridge being completed by the City of Toronto.
ID:16122
  Saturday
2014-Aug-23
to
Sunday
2014-Aug-24
21:00
to
09:00
From: Park Lawn Rd
To: Humber River
Details: The eastbound left and right lanes will be occupied due to construction at the centre median. This will be conducted by Morrison Hershfield. (Closure times: Right lane closed from 9p - 5a; Left lane closed from 5a - 9a)
ID:16150
  Tuesday
2014-Sep-02
to
Thursday
2014-Sep-04
23:00
to
05:00
Continuous
At: South Kingsway
Details: Off-ramp to South Kingsway will be occupied due to replacement of high voltage power cables for Hydro One. This will be done by Robert B Somerville.
ID:16056
Full Closure Location Friday
2014-Sep-26
to
Monday
2014-Sep-29
22:00
to
05:00
Continuous
From: Humber River
To: Don Valley Parkway
Details: The eastbound and westbound lanes will be closed due to Fall Maintenance. This will be conducted by the City of Toronto.
Rain Date:
10/31/2014 22:00 to 11/03/2014 5:00
ID:11474
Lake Shore Boulevard
 DatesTimesDescription
  Tuesday
2014-Apr-22
to
Sunday
2015-Feb-22
09:00
to
23:59
Continuous
From: Rees St
To: Van De Water Cres
Details: The westbound passing lane will be occupied due to installation of a tunnel. This will be conducted by C & M Mcnally Engineering.
ID:12772
  Saturday
2014-May-24
to
Sunday
2014-Aug-31
00:01
to
23:59
Continuous
At: Leslie St
Details: One lane eastbound and one lane westbound will be occupied due to TTC Leslie Street Connection Track Project. This will be conducted by Pomerleau.
ID:13664
  Tuesday
2014-Jun-24
to
Saturday
2014-Aug-30
09:00
to
16:00
Daily
At: Don Roadway
Details: The westbound curb lane will be occupied due to instrument installation. This will be conducted by Powerline Plus.
ID:14698
  Wednesday
2014-Jul-30
to
Sunday
2014-Aug-31
09:00
to
19:00
Daily
From: Park Lawn Rd
To: Humber River
Details: Westbound lanes are occupied due to construction. This is being conducted by Soncin construction.
ID:14455
  Wednesday
2014-Jul-30
to
Tuesday
2014-Sep-30
09:00
to
16:00
Daily
At: Don Roadway
Details: All lanes in all directions will be occupied one at a time due to Toronto Hydro underground installation. This will be done by Powerline Plus.
ID:15645
  Thursday
2014-Jul-31
to
Monday
2014-Aug-25
07:30
to
18:30
Daily
At: Bastion St
Details: The right lane close to the sidewalk, going southwest, will be occupied due to concrete pad for bus shelters and electrical trenching. This will be conducted by Astral Media/ET Construction Inc.
ID:15473
  Monday
2014-Aug-18
to
Wednesday
2014-Dec-31
07:00
to
17:30
Daily
From: Brookers Lane
To: Park Lawn Rd
Details: Westbound curb lane will be occupied due to road widening/resurfacing, sidewalk construction and sanitary sewer replacement on Park Lawn Road, and on Lake Shore Blvd West. This will be done by Il Duca Contracting Inc.
ID:16019
  Monday
2014-Aug-18
to
Sunday
2014-Aug-31
23:00
to
06:30
Daily
At: Cherry St
Details: The westbound centre and right lanes will be occupied due to the Gardiner Expressway interim repairs. This will be conducted by MMM Group.
ID:15934
  Tuesday
2014-Aug-19
to
Friday
2014-Sep-19
09:30
to
15:30
Weekdays
From: Lower Jarvis St
To: York St
Details: Westbound passing lane will be occupied due to F. G. Gardiner Expressway Interim Repairs by MMM Group.
ID:15957
  Wednesday
2014-Aug-20
to
Saturday
2014-Aug-23
19:00
to
07:00
Continuous
At: Don Roadway
Details: All lanes will be occupied (one lane only open at all times) 400m east of Don Roadway and 200m west of Don Roadway due to THESL UG installation by Powerline Plus.
ID:16078
Full Closure Location Sunday
2014-Oct-19
06:00
to
15:00
From: Windermere Ave
To: Parliament St
Details: The eastbound and westbound lanes will be closed due to Toronto Scotiabank Waterfront Marathon.
ID:11477

Notes

Full Closure LocationThese rows indicate a full road closure.

A closure can be for one day or may span multiple days.
The following table shows the definition of the notes in the time column for closures longer than one day:

Example:From 2014-02-18 09:00 To 2014-03-28 16:00
Continuous The road is closed starting 2014-02-18 at 09:00 and is not open until 2014-03-28 at 16:00.
Daily Between the dates of 2014-02-18 to 2014-03-28, the road is closed between the hours of 09:00 and 16:00 everyday and is open all other times.
Weekends Between the dates of 2014-02-18 to 2014-03-28, the road is closed between the hours of 09:00 and 16:00 on Saturdays and Sundays and is open all other times.
Weekdays Between the dates of 2014-02-18 to 2014-03-28, the road is closed between Mondays and Fridays between the hours of 09:00 and 16:00 and is open all other times.